Section | Date | Issue | Size | Title |
Sec. 000 | 1991-10-09 | 530.76 KB | Telephone Program Publications | |
Sec. 101 | 1962-12-01 | 3 | 123.81 KB | Objectives and Scope of the REA Telephone Engineering and Construction Manual |
Sec. 102 | 1981-03-01 | 70 | 565.22 KB | Numerical Index (Telephone Portion) |
Sec. 102 | 1990-06-01 | 73 | 298.03 KB | Numerical Index |
Sec. 105 | 1979-10-01 | 1 | 399.19 KB | Summary of REA Construction Procedures |
Sec. 116 | 1965-12-01 | 1 | 2.35 MB | Plant Engineering and Record System |
Sec. 116 A1 | 1966-03-01 | 1 | 33.35 KB | Plant Engineering and Record System |
Sec. 118 | 1978-05-01 | 1 | 1.30 MB | Plant Records System - Serving Area Value Engineering for Rural Systems |
Sec. 128 | 1955-05-01 | 1 | 78.30 KB | Cutsheet |
Sec. 141 | 1966-06-01 | 2 | 229.41 KB | Fire Alarm Service (Community Dial Systems) |
Sec. 157 | 1967-05-01 | 4 | 1.26 MB | Customer Toll Dialing |
Sec. 201 | 1983-11-01 | 5 | 337.45 KB | Introduction to Rural Telephone System Designs |
Sec. 203 | 1971-04-01 | 1 | 367.58 KB | Existing Plant Considerations for a Telephone System Design |
Sec. 204 | 1971-04-01 | 1 | 2.40 MB | Telephone System Design |
Sec. 205 | 1971-05-01 | 5 | 2.06 MB | Assembly and Arrangement of an Area Coverage Design |
Sec. 206 | 1971-05-01 | 2 | 2.22 MB | Area Coverage Survey (REA Bulletin 322-1) |
Sec. 207 | 1974-06-01 | 1 | 421.98 KB | Design Criteria for Plant Reinforcement - Upgrading From Four-Party to All One-Party |
Sec. 208 | 1965-03-01 | 5 | 812.02 KB | Local Exchange Numbering Plans and Selector Level Assignments |
Sec. 210 | 1974-07-01 | 8 | 554.64 KB | Telephone System Design - Sizing Criteria |
Sec. 212 | 1970-11-01 | 3 | 1.79 MB | Ringing Systems |
Sec. 212 A1 | 1971-01-01 | 3 | 80.56 KB | Ringing Systems |
Sec. 212 A2 | 1973-05-01 | 3 | 67.14 KB | Ringing Systems |
Sec. 215 | 1960-11-01 | 2 | 1.79 MB | Rehabilitation of Existing Outside Plant |
Sec. 218 | 1987-02-01 | 4 | 780.39 KB | Plant Annual Cost Data for System Design Purposes |
Sec. 218 A3 | 1965-06-01 | 2 | 113.99 KB | Plant Annual Cost Data for System Design Purposes |
Sec. 218 A3 | 1965-06-01 | 2 | 113.99 KB | Plant Annual Cost Data for System Design Purposes |
Sec. 221 | 1966-06-01 | 3 | 2.16 MB | Assignment of Line and Station Numbers (Terminal Per Station Systems) |
Sec. 230 | 1986-02-01 | 2 | 524.91 KB | General Principles of Feeder-Distribution Cable Engineering |
Sec. 231 | 1986-02-01 | 2 | 2.56 MB | Design Techniques of Feeder-Distribution Cable Engineering |
Sec. 232 | 1986-02-01 | 2 | 1011.04 KB | Transmission Design and Costs Considerations of Feeder-Distribution Cable Engineering |
Sec. 301 | 1976-12-01 | 3 | 687.05 KB | Central Office Buildings |
Sec. 302 | 1989-04-01 | 6 | 1.67 MB | Power Requirements for Community Central Office Equipment |
Sec. 304 | 1979-02-01 | 1 | 2.03 MB | Central Office Replacement Economic Studies Guidelines |
Sec. 306 | 1985-09-01 | 1 | 571.22 KB | Earthquake Bracing for Central Office Equipment |
Sec. 319 | 1978-10-01 | 4 | 2.43 MB | Interoffice Trunking and Signaling |
Sec. 320 | 1990-06-01 | 5 | 604.05 KB | Emergency Generating and Charging Equipment |
Sec. 322 | 1990-02-01 | 3 | 2.82 MB | Application Guide for the Preparation of Detailed Digital Central Office Equipment Requirements (Parts III and IV of REA Form 522) |
Sec. 323 | 1979-09-01 | 1 | 1.23 MB | Fundamentals of Digital Techniques and Switching |
Sec. 324 | 1980-04-01 | 1 | 476.63 KB | Digital Terminology |
Sec. 325 | 1966-11-01 | 7 | 1.64 MB | Application Guide for the Preparation of Detailed Dial Central Office Equipment Requirements |
Sec. 325 A1 | 1969-04-01 | 7 | 155.96 KB | Application Guide for the Preparation of Detailed Dial Central Office Equipment Requirements |
Sec. 325 A2 | 1969-12-01 | 7 | 171.85 KB | Application Guide for the Preparation of Detailed Dial Central Office Equipment Requirements |
Sec. 326 | 1963-04-01 | 2 | 377.91 KB | Application Guide for the Preparation of Part III Specifications - Detailed Toll Office Equipment Requirements |
Sec. 327 | 1978-01-01 | 4 | 1.38 MB | Application Guide for the Preparation of Detailed Equipment Requirements for Direct Distance Dialing Equipment |
Sec. 328 | 1978-06-01 | 3 | 532.08 KB | Application Guide for the Preparation of Detailed Equipment Requirements for Automatic Number Identification Equipment |
Sec. 329 | 1964-09-01 | 1 | 416.21 KB | Expansion of Existing Dial Central Office Switchboards |
Sec. 329 A1 | 1965-05-01 | 1 | 60.74 KB | Expansion of Existing Dial Central Office Switchboards |
Sec. 329 A2 | 1965-10-01 | 1 | 97.08 KB | Expansion of Existing Dial Central Office Switchboards |
Sec. 329 A3 | 1967-04-01 | 1 | 134.44 KB | Expansion of Existing Dial Central Office Switchboards |
Sec. 330 | 1970-06-01 | 4 | 260.86 KB | Maximum Electrical Subscriber Loops Attained with Long Line Adapters |
Sec. 331 | 1967-07-01 | 1 | 495.49 KB | The Application of Common Mode Operation to Central Office Equipment |
Sec. 331 A1 | 1967-10-01 | 1 | 38.22 KB | The Application of Common Mode Operation to Central Office Equipment |
Sec. 332 | 1969-08-01 | 1 | 235.49 KB | Guide for Utilization of Central Office Loop Extenders |
Sec. 335 | 1976-04-01 | 2 | 2.84 MB | Application Guide for the Preparation of Detailed Common Control Central Office Equipment Requirements |
Sec. 335 A1 | 1977-08-01 | 2 | 36.12 KB | Application Guide for the Preparation of Detailed Common Control Central Office Equipment Requirements |
Sec. 340 | 1979-01-01 | 2 | 424.69 KB | Subscriber Line Concentrators |
Sec. 341 | 1984-10-01 | 2 | 306.12 KB | Application Guide for the Preparation of Detailed Line Concentrator Requirements |
Sec. 350 | 1964-09-01 | 1 | 476.37 KB | Basic Types of Switching Systems |
Sec. 463 | 1958-01-01 | 1 | 1.98 MB | REA-1 Transposition System |
Sec. 465 | 1956-07-01 | 1 | 450.78 KB | REA-V1 Tranposition System |
Sec. 470 | 1980-06-01 | 1 | 1.97 MB | Switched Special Services and Private Branch Exchange Services |
Sec. 500 | 1960-03-01 | 1 | 712.99 KB | Telephone Traffic |
Sec. 510 | 1956-04-01 | 4 | 2.74 MB | Telephone Traffic - Dial Central Office Equipment Switch Quantities |
Sec. 510 A2 | 1962-01-01 | 4 | 214.33 KB | Telephone Traffic - Dial Central Office Equipment Switch Quantities |
Sec. 510 A3 | 1963-11-01 | 4 | 228.32 KB | Telephone Traffic - Dial Central Office Equipment Switch Quantities |
Sec. 511 | 1956-06-01 | 1 | 966.37 KB | Telephone Traffic - Dial Equipment for Toll Centers |
Sec. 512 | 1957-03-01 | 1 | 856.87 KB | Telephone Traffic - Manual Toll Board Equipment |
Sec. 515 | 1967-08-01 | 3 | 954.90 KB | Telephone Traffic - Measurements |
Sec. 516 | 1972-01-01 | 2 | 1.52 MB | Application Guide for a Traffic Study of a Step-by-Step Telephone Central Office |
Sec. 520 | 1957-03-01 | 1 | 3.32 MB | Central Office Equipment Switch Quantities (Large Central Offices) |
Sec. 525 | 1966-07-01 | 1 | 466.03 KB | Telephone Traffic - Dial Common Control System Equipment Quantities |
Sec. 601 | 1969-10-01 | 2 | 520.09 KB | Outline of the National Electrical Safety Code |
Sec. 602 | 1962-05-01 | 4 | 1.62 MB | Clearances |
Sec. 605 | 1979-01-01 | 4 | 277.31 KB | Right-of-Way Clearing and Trimming Assembly Units - Aerial Plant |
Sec. 610 | 1979-01-01 | 3 | 150.69 KB | Poles |
Sec. 611 | 1960-03-01 | 3 | 1.12 MB | Design of Pole Lines |
Sec. 611 A3 | 1966-10-01 | 3 | 121.83 KB | Design of Pole Lines |
Sec. 615 | 1962-11-01 | 5 | 1.99 MB | Design of Bare Open Wire Plant |
Sec. 615 A1 | 1963-06-01 | 5 | 38.22 KB | Design of Bare Open Wire Plant |
Sec. 616 | 1961-01-01 | 4 | 1.20 MB | Construction of Bare Open Wire Plant |
Sec. 616 A1 | 1962-03-01 | 4 | 103.51 KB | Construction of Bare Open Wire Plant |
Sec. 617 | 1954-04-01 | 1 | 3.47 MB | Railroad Crossing Specification |
Sec. 617 A1 | 1969-09-01 | 1 | 29.29 KB | Railroad Crossing Specification |
Sec. 620 | 1966-05-01 | 2 | 2.43 MB | Design and Construction of Figure 8 Distribution Wire |
Sec. 620 A1 | 1969-09-01 | 2 | 42.43 KB | Design and Construction of Figure 8 Distribution Wire |
Sec. 625 | 1962-08-01 | 6 | 2.80 MB | Open Wire Pole Top Assembly Units |
Sec. 626 | 1962-06-01 | 2 | 3.58 MB | Staking of Aerial Plant |
Sec. 627 | 1955-05-01 | 2 | 362.49 KB | Route and Pole Numbering |
Sec. 628 | 1968-01-01 | 2 | 1.73 MB | Plastic Insulated Cable Plant Layout |
Sec. 629 | 1977-01-01 | 3 | 882.31 KB | Cable Plant Layout - Serving Area Value Engineering for Rural Systems |
Sec. 630 | 1962-03-01 | 3 | 2.30 MB | Design of Aerial Cable Plant |
Sec. 630 A2 | 1966-10-01 | 3 | 831.52 KB | Design of Aerial Cable Plant |
Sec. 630 A3 | 1979-01-01 | 3 | 365.58 KB | Design of Aerial Cable Plant |
Sec. 635 A3 | 1979-03-01 | 1 | 9.96 MB | Construction of Aerial Cable Plant |
Sec. 635 A4 | 1979-08-01 | 1 | 681.18 KB | Construction of Aerial Cable Plant |
Sec. 911 A1 | 1980-05-01 | 2 | 417.96 KB | Station Carrier Application |