Section | Date | Issue | Size | Title |
812-000-003 | 2005-09-19 | 1 | 917.89 KB | Standards for Network Equipment Environments |
812-000-010 | 2003-05-23 | 1 | 55.16 KB | Common Systems - Hardware Products and Materials Specifications |
812-000-012 | 2006-02-16 | 1 | 421.96 KB | Frame, Distributing Frame, MDF, COSMIC, Modular, UMDF, NBDF: Distributing Frame Standards |
812-000-016 ATT | 2003-05-23 | 1 | 509.83 KB | Common Systems - Considerations For Determining the Affects on Floor Loading of Superstructure Suspended From Ceilings |
812-000-016 SBC | 2003-05-23 | 1 | 507.10 KB | Common Systems - Considerations For Determining the Affects on Floor Loading of Superstructure Suspended From Ceilings |
812-000-017 | 2003-05-23 | 1 | 398.74 KB | Common Systems - Cable Installation, Removal and Mining Requirements - Cable Racks and Raceways |
812-000-027 | 2003-05-01 | 0 | 3.90 MB | Grounding and Bonding Requirements for Network Facilities |
812-000-028 | 2003-05-01 | 0 | 1.36 MB | Grounding and Bonding for Network Facilities - Design Fundamentals |
812-000-029 | 2003-05-23 | 1 | 194.76 KB | Common Systems - 48V dc Power Distribution System Single Line Diagram Records |
812-000-030 | 2003-07-01 | 1 | 648.59 KB | Common Systems - Network Facility Auxiliary Framing and Bracing Requirements |
812-000-030 | 2003-11-14 | 2 | 663.81 KB | Common Systems - Network Facility Auxiliary Framing and Bracing Requirements |
812-000-031 | 2003-07-01 | 1 | 752.83 KB | Common Systems - Network Facility Cable Rack Requirements |
812-000-032 | 2003-08-08 | 1 | 360.06 KB | Common Systems - Through-Penetration Firestopping Requirements |
812-000-035 | 2009-02-25 | 4 | 187.56 KB | Common Systems, Synchronization: AT&T Global Network Synchronization Strategic Plan |
812-000-082 | 2006-10-10 | 2 | 1.59 MB | Line Splitting Deployment M&P for NP&E |